German Engineered Wind Turbines
  • COMPANY
  • News
    • Press review
  • Products
    • PowerWind 56/60
    • PowerWind 90/100
    • PowerWind 500
  • Service
    • Service Concept
    • Maximum customer benefit
    • Customised service solutions
    • Know-how transfer
  • References
    • Azerbaidzhan
    • Bulgaria
    • Germany
    • Great Britain
    • Italy
    • Poland
    • Romania
    • USA
  • Career
    • PowerWind as an employer
    • Job offers
    • Internships & Final Theses
    • Your application
    • Speculative application
  • Contact
    • How to find us
  • Home  » 
  • References  » 
  • Germany  » 
  • Bremerhaven - Powerwind 90

Germany

Location:
Bremerhaven

Windturbine:
PowerWind 90

Installation date:
21.12.2010

Characteristics:
The first prototype of the PowerWind 90, with a 90 meter rotor diameter, was installed early December 2010 at the Grauwallring ring in Bremerhaven. The commissioning of the 2.5 MW wind turbine was already completed on the 21st of December 2010.

PowerWind 90
  • Bremerhaven
  • Bremerhaven - Powerwind 90
  • Imprint
  • Downloads
  • Sitemap
drucken